Innovative Site Office Container: Engineered Mobile Headquarters
Core Concept
A purpose-built, mobile site office container designed as a 20ft flat-pack structure. Targets engineers, surveyors, and foremen for planning, storing drawings, and briefings. Its key advantage is being a reliable, comfortable, quickly deployable headquarters – not a retrofitted shipping container.
Design & Mobility
Ships disassembled (flat-pack) – roof, floor, posts, panels packed inside a single 40ft high-cube container. One truck carries up to 12 complete site office containers, slashing freight costs per unit by 70%. Four workers assemble this site office container on level ground using basic hand tools and a cordless drill in under 3 hours. No crane, welding, or special licenses required.
Structure & Durability
Primary frame uses 3mm hot-dip galvanized SGH340 steel corner posts, roof, and floor main beams. Secondary structure features cold-formed Q235B roof beams & high-strength Π-type Q345 floor cross members. The entire frame is powder-coated 80 µm grey-white for scratch/corrosion resistance. Finite element analysis ensures it withstands 0.5 kN/m² wind load (120 km/h gusts) and a 2.0 kN/m² floor live load.
Weather Protection & Insulation
Roof: 0.5mm galvalume sheet + 14kg/m³ glass wool insulation + secondary galvalume ceiling (central bread-roof profile drains rain internally). Walls: 75mm insulated sandwich panels (glass/rock wool; Lambda 0.038 W/m·K). Keeps interior 8-10°C cooler in summer and warmer in winter. Finishes: External options (UV marble stone, metal, cement board, film) & internal options (wood-plastic, PVC, branded wallpaper). Floor: 18mm cement board + 2mm anti-slip rubber sheet – ensuring no cold bridges in this site office container.
Security, Lighting & Ventilation
Includes a full-size pre-installed PVC sliding window (1120x1100mm) with double glazing, bars, and mosquito screen. Entrance is a pre-installed metal door (840x2035mm) with 3-point locking (optional aluminum alloy upgrade).
Electrical System (Plug-&-Play)
Factory wiring in galvanized trunking. Features a 10-digit PVC distribution board: Lighting (10A/1P), Air-con (20A/2P), Spare (5A/2P), RCD (16A/2P). Circuits: Main (3x6mm²), Sockets (3×2.5mm²), Lighting (3×1.5mm²). Power via 32A industrial socket. Four universal 13A outlets + switch. Two 16.5W LED strip lamps (3,200 lumens, ISO 8995 compliant). Standard 220-240V 50Hz (110V adaptors available).
Connectivity & Expansion
Connect multiple site office containers side-by-side using galvanized cable bridges (IP65 external cables). Stack up to 3 levels with optional casting & twist-locks. Add stair towers and balcony modules.
Compliance & Certification
Complies with CE, ISO9001, AS/NZS 1170. Fire safety: A-grade non-combustible walls; 60-min integrity roof/floor. Full material traceability, mill certificates, and test reports simplify permits.
Sustainability
Galvanized steel frame is 98% recyclable. Panels use CFC-free agents. Flat-pack design cuts CO₂ per unit by 60% vs rigid site office containers. Designed for disassembly, repair, and redeployment.
Deployment Scenarios
- Construction site office container/meeting room
- Mining camp control room (with HVAC/server)
- Road/bridge maintenance base
- Emergency response HQ (<24h deployable)
- Military field command post (camouflage/EMP optional)
Options & Upgrades
Internal partition | Rock wool insulation (fire resistance) | Aluminum doors/roller shutters/bullet-resistant glass | HVAC louvers/rooftop solar | Thicker insulation (arctic) | IR-reflective roof paint/ridge vents (tropical)
Quality Control
Jig-assembled, MIG-welded frames hot-dip galvanized (80µm). Panels vacuum-pressed (120°C); every 10th crush-tested (10 kN/m²). Electrical: 2000V hi-pot & 500 MΩ testing. Full erection & rain-chamber trial pre-shipment.
Logistics & Support
Lead Time: 10-15 days (1-10 site office containers), 20-25 days (100-unit camp). Warranty: Frame/panels 5 years; Electrical 2 years. Remote support & 72h spare parts. Multilingual guides (videos + manuals) + optional on-site tech.
Return on Investment (ROI)
Purchase cheaper than leasing after 2 projects. Resale value >60% at 5 years due to durable frame. Converts capex into a movable asset, not expense.
















